{"id":11442,"date":"2024-10-24T14:32:40","date_gmt":"2024-10-24T14:32:40","guid":{"rendered":"https:\/\/santasizolasyon.com.tr\/modular-water-tank-assembly-steps\/"},"modified":"2024-10-24T14:32:40","modified_gmt":"2024-10-24T14:32:40","slug":"modular-water-tank-assembly-steps","status":"publish","type":"post","link":"https:\/\/santasizolasyon.com.tr\/en\/modular-water-tank-assembly-steps\/","title":{"rendered":"Modular Water Tank Assembly Steps"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">\u0130\u00e7indekiler<\/p>\n<label for=\"ez-toc-cssicon-toggle-item-6a4571e19d1ef\" class=\"ez-toc-cssicon-toggle-label\"><span class=\"ez-toc-cssicon\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/label><input type=\"checkbox\"  id=\"ez-toc-cssicon-toggle-item-6a4571e19d1ef\" checked aria-label=\"Toggle\" \/><nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/santasizolasyon.com.tr\/en\/modular-water-tank-assembly-steps\/#Modular_Water_Tank_Assembly_Steps\" >Modular Water Tank Assembly Steps<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/santasizolasyon.com.tr\/en\/modular-water-tank-assembly-steps\/#Accessories_Used_in_Assembly\" >Accessories Used in Assembly<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"p1\"><span class=\"ez-toc-section\" id=\"Modular_Water_Tank_Assembly_Steps\"><\/span><b>Modular Water Tank Assembly Steps<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ol class=\"ol1\">\n<li class=\"li2\"><b>Floor Preparation:<br \/>\n<\/b>The floor to be installed should be cleaned of factors such as oil, dust, dirt and cleaned from effects such as glass, metal pieces or concrete sprouts.<\/li>\n<li class=\"li2\"><b>Space Adjustment:<br \/>\n<\/b>The installation area should be at least 50-60 cm clearance from the side walls and ceiling in accordance with the dimensions of the warehouse.<\/li>\n<li class=\"li2\"><b>Placement of Plinths:<br \/>\n<\/b>Plastic plinths for the warehouse floor are placed in a clamped manner. Under each modular panel, 4 plastic pedestals are placed. In government tender projects, concrete or steel pedestals specified by the Ministry of Environment, Urbanization and Climate Change can be used instead of plastic.  <\/li>\n<li class=\"li2\"><b>Installation of Base Sheets:<br \/>\n<\/b>Tank base sheets are placed on the pedestals. Corner fasteners and gaskets are attached to the joints of the sheets. Assembly is completed by tightening the bolts.  <\/li>\n<li class=\"li2\"><b>Installation of Side Panels:<br \/>\n<\/b>EPDM rubber gaskets are placed on the base sheets and the panels are mounted with the help of bolts. Panel thicknesses vary for each floor in multi-storey warehouses. Contact Santas sales team for detailed technical information.  <\/li>\n<li class=\"li2\"><b>Installation of Corner and Tension Elements:<br \/>\n<\/b>Corner brackets are placed at the corner points and tension fasteners are placed. After the 1st floor modules are completed in &#8220;L&#8221; shape, the 2nd floor assembly starts.  <\/li>\n<li class=\"li2\"><b>Ceiling Modules Installation:<br \/>\n<\/b>Ceiling sheet modules are installed and bolts are tightened. After the last panel is placed, the tension connections inside the tank are installed and all external bolts are tightened. <\/li>\n<li class=\"li1\"><b>Accessory Installation:<br \/>\n<\/b>The entrance cover and ladder on the warehouse are mounted.<\/li>\n<\/ol>\n<h2 class=\"p1\"><span class=\"ez-toc-section\" id=\"Accessories_Used_in_Assembly\"><\/span><b>Accessories Used in Assembly<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul class=\"ul1\">\n<li class=\"li2\">17 Key<\/li>\n<li class=\"li2\">Chair (Connection Joining Element)<\/li>\n<li class=\"li2\">Round Gasket<\/li>\n<li class=\"li2\">Square Gasket<\/li>\n<li class=\"li2\">Bolt<\/li>\n<li class=\"li2\">Nut<\/li>\n<li class=\"li2\">Stamp<\/li>\n<li class=\"li2\">Japanese Adhesive<\/li>\n<li class=\"li2\">EPDM Gasket<\/li>\n<li class=\"li2\">Warehouse Roof Cover<\/li>\n<li class=\"li2\">Staircase<\/li>\n<li class=\"li2\">Inlet-Outlet Chucks<\/li>\n<li class=\"li1\">(Optional) Vortex Plate<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Modular Water Tank Assembly Steps Floor Preparation: The floor to be installed should be cleaned of factors such as oil, dust, dirt and cleaned from effects such as glass, metal pieces or concrete sprouts. Space Adjustment: The installation area should be at least 50-60 cm clearance from the side walls and ceiling in accordance with&hellip;<\/p>\n","protected":false},"author":1,"featured_media":11410,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[118],"tags":[],"class_list":["post-11442","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-su-en","category-118","description-off"],"_links":{"self":[{"href":"https:\/\/santasizolasyon.com.tr\/en\/wp-json\/wp\/v2\/posts\/11442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/santasizolasyon.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/santasizolasyon.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/santasizolasyon.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/santasizolasyon.com.tr\/en\/wp-json\/wp\/v2\/comments?post=11442"}],"version-history":[{"count":0,"href":"https:\/\/santasizolasyon.com.tr\/en\/wp-json\/wp\/v2\/posts\/11442\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/santasizolasyon.com.tr\/en\/wp-json\/wp\/v2\/media\/11410"}],"wp:attachment":[{"href":"https:\/\/santasizolasyon.com.tr\/en\/wp-json\/wp\/v2\/media?parent=11442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/santasizolasyon.com.tr\/en\/wp-json\/wp\/v2\/categories?post=11442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/santasizolasyon.com.tr\/en\/wp-json\/wp\/v2\/tags?post=11442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}